How To Interpret The Score
| Score | Decision | What It Means |
|---|---|---|
| 80–100 | Ready For A Controlled Pilot | The basics exist; keep scope narrow and validate every result |
| 55–79 | Prepare Before Connecting | Resolve the named gaps before using real company data |
| 0–54 | Do Not Connect Yet | Governance or validation foundations are not ready |
Planning estimate: the value calculation assumes every selected hour is actually saved and redeployed productively. Measure the pilot against a baseline before treating it as return.
Connector and permission facts come from OpenAI’s Data Agent announcement, last checked Sep 29, 2026. AmpysApps does not receive or store the information entered here.